Oil and Natural Gas service Tarun Kapoor visited Baghjan Oil well number 5 victory site on Tuesday alongside CMD and Functional Directors of OIL to check out the work progress at the site.
Kapoor additionally visited the alleviation camp at Baghjan.
He checked on the advancement and communicated his fulfillment with the execution of the arrangement.
He had a nitty gritty conversation with the locale organization and advised them on the following game-plan subsequent to evaluating all the subtleties gave by the organization.
On Wednesday, Kapoor sat with the specialists from M/s Alert Disaster Control, VP Mahawar, Ex-Director (Onshore), ONGC and groups from OIL and ONGC to comprehend the arrangement of topping the well.
“Bar in delivering oil and gas wells has been lifted in barely any territories on Tuesday. Bar despite everything proceeds at not many different areas influencing the creation,” expresses an OIL discharge.
Bar at one penetrating area and one work over area has been lifted on Tuesday while barricade despite everything proceeds at one additionally boring area and three workover areas,” the discharge included.
The conclusion notice served by Pollution Control Board of Assam (PCBA) was pulled back on Monday.
PCBA has requested that OIL satisfy certain conditions inside explicit time periods. OIL will find a way to agree to the orders/states of PCBA.
On Sunday, OIL had expressed that it will move the Gauhati High Court moving the PCBA’s structure to close down the Baghjan oil field in Tinsukia region.
All the while, the geophysical overview is being done with instruments, viz. Resistivity meter, Proton accuracy Magnetometer and VLF (Very Low Frequency) meter to comprehend the subsurface movement. InSAR contemplates are being completed to watch the subsidence assuming any. Examination of information will be done in Jorhat and Hyderabad.